Checking job availability...
Original
Simplified
- Perform line study for setting up capacity model
- Apply statistical analysis to acquire model parameters and Factory Operation related buffer strategy
- Work with relevant teams for auditing and updating model parameters (utilization, UPH, overhead, etc)
- Maintain Factory Planning Master Data in a manner that supports capacity analysis, factory scheduling, supply planning and multi-functional reporting needs
- Use Microsoft Excel and other applications to supplement standard model for quick turn-around analysis
- Maintain robust database of key improvement activities and equipment delivery
- Perform capacity analysis loading plan for setting boundary condition, submitting capital requirement and requesting key activities for throughput improvement
- Perform bottoms-up analyses of approved loading and modeling changes
- Coordinate space planning for incoming tool with facility, relevant equipment and manufacturing team members
- Engage in factory space optimization and network capital optimization by identifying under-utilized/obsolete capacity for transfer, re-sale and/or scrap
- Engage in weekly factory commit activity in collaboration with Factory Planning and Operation teams (current quarter / rolling 13 weeks), and Central Planning teams (up to 9 months)
- Submit equipment and tooling purchase request and coordinate downstream activities: PO release, space enablement, delivery and production release
- Comprehend Tactical Operation constraint in identifying dynamic constraint workstation for robust factory loading commit
- Collaborate with Strategic Scenario and Capital Planning team on investigation of tactical boundary condition comparison with strategic boundary condition
- Take charge of capacity related capital and Off-Capital items through capital lifecycle: proposal à disposal through appropriate business process and in timely manner
- Strive for capital optimization through network balancing
- Maintain capital related information in system and offline database for own area (capacity and non-capacity related) in robust manner
- Collaborate with Facility IE team on detailed space enablement plan for incoming tools
- Maintain database of incoming and excess tool list for communication with Facility IE
- Understand assumptions in reports and use them effectively
- Develop and maintain reports that effectively communicate capacity information
- Run regular meeting, take meeting minutes, record action items and ensure closed-loop and accurate completion of action items
- Use established project management approach and methodology when serving as project manager
- Possess a continuous improvement process (CIP) approach where you are always looking for ways to improve current way of doing things
- Apply new (e.g. RPA, Tableau, Power BI) and traditional (Excel, VBA) methods to improve and automate tasks & visualization in the planning system/models
- Finishes the required training timely
- Conducts all work in accordance with Micron EHS (Environment, Health, Safety) and ethics policies
- Provide timely feedback when quality, safety, or ethical issues arise
- Bachelors in Industrial/Mechanical/Computer Engineering and Computer Science preferable
- With at least 2 years of CCA in university, preferably in leadership positions.
- Good in written communication and presentation skills.
- Highly motivated to work in a dynamic environment, with good integrity and character.
- Ability to quickly analyze situations, identify issues, and develop effective solutions under tight deadlines.
- Demonstrated capacity to maintain composure and productivity in high-pressure environments, adapting to changing priorities and challenges.
- Proven ability to prioritize tasks, manage numerous projects simultaneously, and meet deadlines without compromising quality.
- Possess advanced Literacy and Numeracy skills
- Minimum 5 years of relevant experience in modeling capacity through reports and Gemba walk, capacity analysis, capital management through SAP PS (Project Structure) / CALM with hands-on experience in dashboard development or software automation
- Minimum five years of experience in Assembly and Test semiconductor operation with at least 2 years of coding, automation and dashboard development skills
- Perform line study for setting up capacity model
- Apply statistical analysis to acquire model parameters and Factory Operation related buffer strategy
- Work with relevant teams for auditing and updating model parameters (utilization, UPH, overhead, etc)
- Maintain Factory Planning Master Data in a manner that supports capacity analysis, factory scheduling, supply planning and multi-functional reporting needs
- Use Microsoft Excel and other applications to supplement standard model for quick turn-around analysis
- Maintain robust database of key improvement activities and equipment delivery
- Perform capacity analysis loading plan for setting boundary condition, submitting capital requirement and requesting key activities for throughput improvement
- Perform bottoms-up analyses of approved loading and modeling changes
- Coordinate space planning for incoming tool with facility, relevant equipment and manufacturing team members
- Engage in factory space optimization and network capital optimization by identifying under-utilized/obsolete capacity for transfer, re-sale and/or scrap
- Engage in weekly factory commit activity in collaboration with Factory Planning and Operation teams (current quarter / rolling 13 weeks), and Central Planning teams (up to 9 months)
- Submit equipment and tooling purchase request and coordinate downstream activities: PO release, space enablement, delivery and production release
- Comprehend Tactical Operation constraint in identifying dynamic constraint workstation for robust factory loading commit
- Collaborate with Strategic Scenario and Capital Planning team on investigation of tactical boundary condition comparison with strategic boundary condition
- Take charge of capacity related capital and Off-Capital items through capital lifecycle: proposal à disposal through appropriate business process and in timely manner
- Strive for capital optimization through network balancing
- Maintain capital related information in system and offline database for own area (capacity and non-capacity related) in robust manner
- Collaborate with Facility IE team on detailed space enablement plan for incoming tools
- Maintain database of incoming and excess tool list for communication with Facility IE
- Understand assumptions in reports and use them effectively
- Develop and maintain reports that effectively communicate capacity information
- Run regular meeting, take meeting minutes, record action items and ensure closed-loop and accurate completion of action items
- Use established project management approach and methodology when serving as project manager
- Possess a continuous improvement process (CIP) approach where you are always looking for ways to improve current way of doing things
- Apply new (e.g. RPA, Tableau, Power BI) and traditional (Excel, VBA) methods to improve and automate tasks & visualization in the planning system/models
- Finishes the required training timely
- Conducts all work in accordance with Micron EHS (Environment, Health, Safety) and ethics policies
- Provide timely feedback when quality, safety, or ethical issues arise
- Bachelors in Industrial/Mechanical/Computer Engineering and Computer Science preferable
- With at least 2 years of CCA in university, preferably in leadership positions.
- Good in written communication and presentation skills.
- Highly motivated to work in a dynamic environment, with good integrity and character.
- Ability to quickly analyze situations, identify issues, and develop effective solutions under tight deadlines.
- Demonstrated capacity to maintain composure and productivity in high-pressure environments, adapting to changing priorities and challenges.
- Proven ability to prioritize tasks, manage numerous projects simultaneously, and meet deadlines without compromising quality.
- Possess advanced Literacy and Numeracy skills
- Minimum 5 years of relevant experience in modeling capacity through reports and Gemba walk, capacity analysis, capital management through SAP PS (Project Structure) / CALM with hands-on experience in dashboard development or software automation
- Minimum five years of experience in Assembly and Test semiconductor operation with at least 2 years of coding, automation and dashboard development skills