S
Project Engineer (for data center construction)
$ 4,500 - $ 7,000 / month
Checking job availability...
Original
Simplified
Our client, a leader in data centre construction, seeks a Project Engineer (Electrical) with 3+ years of experience and a PE certification. The role involves managing electrical design, installation, and commissioning, ensuring compliance with PE standards and data centre regulations.
Key Responsibilities:
- Oversee electrical systems in data centre projects, including power distribution and backup systems.
- Ensure compliance with Singapore’s building codes and industry standards.
- Coordinate with contractors, consultants, and regulatory bodies.
- Conduct site inspections, risk assessments, and troubleshooting.
Requirements:
- Bachelor’s degree in Electrical Engineering.
- PE certification in Singapore is required.
- 3+ years of experience in electrical engineering, preferably in data centres.
- Strong knowledge of UPS, backup power, and high-voltage systems.
Apply now with your updated resume and email to [email protected]
Job Type: Full-time
Pay: $4,500.00 - $7,000.00 per month
Benefits:
- Health insurance
- Professional development
Schedule:
- Monday to Friday
Supplemental Pay:
- 13th month salary
- Performance bonus
Work Location: In person